



2. Raw materials of potato starch production equipment machine to produce starch modified starch making equipment: corn starch. cassava starch. potato starch.maize starch.tapioca starch
3. Products: oil drilling starch. Pre-gelatinized starch
4. Capacity of potato starch production equipment machine to produce starch modified starch making equipment: 150kg/h.300kg/h. 500kg/h. 1ton/h. 2ton/h
5. Flow Chart of potato starch production equipment machine to produce starch modified starch making equipment:
Mixing—Extrusion—Drying—Grinding—Blending-Packing
1) Simple structure in linear type .easy in installation and maintation.
2) Adopting advanced world famous brand components in pneumatic parts .electric parts and operation parts.
3) High pressure double crank to control the die opening and closing.
4) Running in a high automatization and intellectualization.no pollution
5) Apply a linker to connect with the air conveyor .which can directly inline with filling machine .
Model | Power Consumption | Output | size |
MT65 processing line | 60kw | 100-150 kg/h | 24000*1200*2200 mm |
MT70 processing line | 80kw | 200-250 kg/h | 26000*1500*2200 mm |
MT85 processing line | 145kw | 300-500 kg/h | 29000*3500*4300 mm |

Output:70-100kg/h
Size??900*700*1200mm
Function:To mix the material such as the wheat flour and waster.
Size:2800*800*1800m
Function:To extrude and inflate the food.the main machine of the line


High:23000mm
Function: Its function is mainly make the puffed food to fryer

* The company is responsible for the installation. debugging equipment. training personnel until the production of qualified products;Provide process formula. provide seasoning. agent printed packaging bags.


Packaging | ||
Packaging Details | 1.Packaging Specification Outside Pachage:Wooden Packing as Exportand Standard. 2.Delivery time: 5-10days after received 40% of the whole payment. 3.About Shipping: We can be resonsible for the shipping .of course.we can also accept and cooperate with your agent if you have shipping forwarder in China. | |
Payment term and installation costs
2.We accept 30% of the contract deposit. 70% before delivery. accept the factory inspection. special circumstances can be negotiated.
3.We provide professional technology on-site installation and debugging. air tickets. accommodation and foreign service subsidies of 70$/day. which are borne by the buyer.









2. We can draw according to customer’s factory space;
3.We accept special design;
(1). Assist clients to prepare for the first construction scheme;
(2). Install and debug the equipment;
(3). Train the first-line operators;
(4). Examine the equipment;
(5). Take initiative to eliminate the troubles rapidly;
(6). Provide perfect service;
(7). Provide technical exchanging.
We are manufacturers.
2. When can we arrange shipment?
We usually arrange shipment within 15 days after getting deposit.but customized machines should be more than 25 days.
3. Do you provide equipment operation training after sale?
Yes. We can send professional engineers to the working site for equipment installation. adjustment. and operation training. All of our engineers have passport.
Yes. We have experienced engineers and technical team. can provide personalized service.