2.The equipment list of bread crumbs manufacturing plant extruder:Mixer→Screw Conveyor→Twin Screw Extruder→Air Conveyor→ Multi-layer dryer→Cooling machine
3.Raw material of soya protein meat analogue processing machine: textured soy protein machine adopt defatted soya flour. low temperature soya flakes as raw materials
4.Using of soya protein meat analogue processing machine can be used to produce soya nuggets. TVP/TSP. soya chunks by adjusting the moulds from extruder; meanwhile it can produce cereal. snacks by adjusting the screws from extruder
5.Capacity of soya protein meat analogue processing machine:100kg/h-150kg/h. 150kg/h-200kg/h. 200kg/h-260kg/h. 300kg/h and so on.
Model | Installed Power | Power consumption | Output | Size |
MT65 | 84KW | 59KW | 100-150KG/H | 40000*1200*2200mm |
MT70 | 160KW | 120KW | 150-200KG/H | 41000*1500*2200mm |
MT75 | 190kw | 140kw | 150-200KG/H | 43000*1500*3200mm |
MT85 | 210kw | 140kw | 250-300kg/h | 45000*1500*3500mm |

steel 304. It mainly stirs powdery raw materials and adds an appropriate amount of waterPower:4kw 7.5kw 15kw
Capacity:20-30kg 70-80kg 170-180kg
Shelf material: carbon steel
motor power: 22KW 30kW 45KWPower of rotary cutting motor: 0.75kw
Feeding motor power: 0.75kw
Pump motor power: 0.37kw
Heating power: 10kW 14kw 14kw


requirements. And our oven has fuel. gas. electricity. customers can choose according to their own requirements. The design is
compact. reasonable and easy to operate. Our oven drive is double pitch roller chain drive. round-trip drying. smooth operation.no
jam. The drying temperature and time are also adjustable.

3. Shipping: 15-35 working days after receiving deposit.
4. The pictures of our packaging logistics for your reference.



Q:How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 20-35 days if the goods are not in stock. we could discuss before contract.
Q: Could you supply all the parameters about the machines?
A: Yes. we will supply all the parameters. price. layout drawing. factory design etc.
Q: What is your terms of payment ?
A: 30% T/T in advance . 70% balance before shippment after inspection.
Q: How about the after-service?
A: We will send 1 engineer to the buyer's factory for 7-14 days period installation and training to the operators.
Q:do you supply any formula to buyer?
A: yes. we supply formulas to buyer.